top of page
Search
  • Writer's pictureTFC

Trails in Togh, Artsakh: Construction and blazing (TECHNICAL REPORT)

Updated: Jun 3, 2021

Construction and blazing of hiking trails on segments

Gtichavank Loop Trail, Pasture View Trail, Woodcutters Trail and

Togh-Tumi road to Gtich Monastery

The technical report is to specify the work done by “Trails for Change” Tourism Infrastructure Development NGO in the period from 09.03.2019 to 22.03.2019 in Artsakh. Intended work for this period was: 9 km of bush clearing, trailblazing of Gtichavank Loop Trail, 2,8 km of trail building, brush clearing, trailblazing of Pasteur View Trail , 3.6 km of trail building, brush clearing, grass clearing, trailblazing works of Woodcutters Trail, 1,2 km trail building, brush clearing, grass clearing, trailblazing works of Togh-Tumi road to Gtich Monastery.


This technical document comprises the bulk of the report and is accompanied by maps of the routes and supporting work pictures.

Gtichavank Loop Trail (Total length: 9000m)

bush clearing, trail blazing works.

Status: Completed

Map #1
Table №1

Photo Report

Pasture View Trail (Total length: 2830m)

trail building, brush clearing, grass clearing, trail blazing works.

Status: Completed

Map#2
Table №2

Photo Report

Woodcutters Trail (Total length: 3600m)

trail building, trail brushing, grass clearing trail blazing works.

Status: Completed

Map#3
Table №3

photo Report

Togh-Tumi Road to Gtich Monastery (Total length: 1200m)

trail building, trail brushing, grass clearing trail blazing works.

Status: Completed

Table №4

Photo Report

Prepared by “Trails for Change” Tourism Infrastructure Development NGO, on March 29, 2019

Anna Tadevosyan: TFC General Manager

Aida Arakelyan: TFC Project Manager

Armen Manukyan: TFC Trail Crew Lead

3 views0 comments
bottom of page